Capping Stack Assembly – Time Lapse Video

With the first capping stack now in storage in Stavanger, and the other stacks now arriving for storage in Singapore, Saldanha and Rio, this video demonstrates the on-site assembly process.

Each capping stack is assembled at Trendsetter’s site in Houston and undergoes a thorough testing process, including robust pressure testing. The stacks are then disassembled and transported to their storage location before on-site reassembly.

This time-lapse video shows this reassembly taking place on location in Stavanger, February 2013.

Link to item Date: 13 June 2013